I also prepared some other parts for tomorrow. With any leftover epoxy from the glassing operation, I can glass the interior of the daggerboard trunk. Since I had already coated these parts with epoxy, I sanded in down and left a rough finished surface. I trimmed some glass cloth scraps to size. I plan to lay the cloth on the parts, then when the epoxy has reached gel stage, Ill use the daggerboard spacers as a template to trim the edges. Thus, the glass will only be on the interior trunk face, while the overall dimensions of the assembled trunk wont be increased by the thickness of the glass. I also have on hand some other parts, ready to be assembled with excess epoxy. Mainsail boom, mast joint and masthead cap, daggerboard handle, and skeg are ready to go.
Finally, I checked out the sails: 77 square feet of Dacron (?) cloth, complete with grommets, telltales, and battens. They look great- I cant wait to try them out! Total hours 44.00.
0 komentar:
Posting Komentar