Senin, 22 Februari 2016

Noahs dinghy

On such a rainy night, it seemed appropriate that I should be building a boat. If the storm lasts much longer, Ill have to begin gathering two of every animal. My task tonight was a brief one: the second layer of the starboard rubrail was attached with cabo-sil thickened epoxy. It was a fairly quick process, and I only charged the Passagemaker dinghy building total with a half hours effort. But I continued on with the final touches of the trailer assembly. This included the wiring harness. A simple enough affair, made up of four wires and a ground strap. But fishing the wires from the hitch through the frame of the trailer and out the small holes provided in the frame proved to be easier said than done. On top of that, I wasnt content to use the crimp connectors provided with the kit. Instead, I soldered the connections for the running and tail lights, with the idea that they will last a little bit longer. Well see. Total hours 67.75.

Related Posts by Categories

0 komentar: